Installation method of intelligent electromagnetic flowmeter

  • KEWILL
  • 2022-07-21 18:19:33
  • 0time

The intelligent electromagnetic flowmeter is an electromagnetic induction flowmeter, which consists of sensors and intelligent signal converters. It can measure the volume flow of various conductive liquids, the measured media include strong corrosive liquids such as acid, alkali, salt, raw water, cooling water and other conductive liquids and solid-liquid two-phase liquids.

In order to ensure the measurement accuracy of the electromagnetic flowmeter, please observe the following points during installation:

1: The transmitter should be installed in a ventilated and dry place. Avoid installing it in a place where the ambient temperature is too high, and try to avoid equipment with strong magnetic fields, such as large motors, transformers, etc. Avoid installing it in places with corrosive gases. Installation location To facilitate maintenance.

2: In order to ensure that the measuring tube of the transmitter is filled with the measured medium, it is best to install the variable transformer vertically with the flow direction from bottom to top. Especially for liquid-solid two-phase flow, it must be installed vertically. If only horizontal installation is allowed on site, it must be installed vertically. Make sure the two electrodes are at the same level

3: In order to avoid the influence of the relative measurement of the flow rate, the flow control valve should be set downstream of the transmitter. For small-diameter transmitters, the distance from the center of the electrode to the inlet end of the flowmeter is equivalent to several times the diameter D. Therefore, there is no requirement for the upstream straight pipe. However, for a flowmeter with a larger diameter, there should generally be a straight pipe section above 5D in the upstream, and generally no straight pipe section is required in the downstream.

4: Valves and bypasses should be installed at both ends of the transmitter.

5: The AC potential of several millivolts measured by the electrode of the electromagnetic flow transmitter is based on the liquid potential in the transmitter. In order to stabilize the liquid potential and keep the transmitter and the fluid at the same potential to ensure stability The transmitter casing and both ends of the metal pipe should be well grounded, and the converter casing should also be grounded. The grounding resistance should not be greater than 10, and it should not be shared with the grounding wire of other electrical equipment. If the transmitter housing cannot be guaranteed to be in good contact with the metal pipes, use metal wires to connect them. Then ground them reliably.

6: The installation site of the converter should avoid strong AC and DC magnetic fields and vibration, the ambient temperature is -20 to 50 °C, does not contain corrosive gases, and the relative humidity is not greater than 80%.

7: In order to avoid interfering signals, the signal between the transmitter and the converter must be transmitted with shielded wires. It is not allowed to put the signal cable and the power cable in parallel in the same cable steel pipe. The length of the signal cable should not exceed 30m in general

主站蜘蛛池模板: 欧美啪啪网 | 国产精品免费小视频 | 国产成人亚洲精品91专区高清 | 高清精品一区二区三区一区 | 99在线观看免费视频 | 精品福利 | 国产在线成人精品 | 丁香色婷婷 | 亚洲国产精品综合久久 | 国产日韩欧美成人 | 黄色在线小视频 | 九九资源站 | 久久99精品久久久久久国产越南 | 人人色在线视频播放 | 国产一级理仑片日本 | 伊人精品在线 | 色噜噜狠狠在爱丁香 | 四虎在线影院 | 视频一区免费 | 99视频精品全部在线播放 | 男女啪网站 | 免费看美女隐私视频网站 | 国产成人看片免费视频观看 | 涩五月婷婷| 国产ww久久久久久久久久 | 久久久免费网站 | 无人码一区二区三区视频 | 777奇米四色米奇影院在线播放 | 久久青青草原精品国产麻豆 | 国产人成午夜免视频网站 | 欧美一区二区三区精品 | 久久看免费视频 | 青草青草伊人精品视频 | 亚洲国产天堂久久综合2261144 | 亚洲日本国产 | 欧美一区精品 | 欧美性色老妇人 | 精品视频入口 | 奇米第八色| 播五月婷婷 | 免费看羞羞视频的网站 |